Tools used for doing work of pointing (filling cement and adjusting in unplastered area) Mattakolu stick used for adjusting the level between the bricks Using Mattakolu between bricks to remove extra cement Applying cement for pointing work in unplastered area
Roof Floor Pre-mold Puja Roof Floor Pre-mold Puja Electrical and Data circuit for 2nd floor from roof floor Electrical and Data circuit for 2nd floor from roof floor Front elevation of the house as seen from the road
Assembly of Footing Assembly of pillars Erection of Pillars into footings More number of pillars erected (total 14 Nos.) Thumb rule 1 pillar per 100 sq. feet of living space