Sanitary pipes in our locality is running 15 feet below the road and we had to use JCB to dig to this depth
5" hole punctured on the main sanitary line and line connected from our house
Pipe line to provide gravitational flow of all waste water from the house
Joint is firmly concreted to avoid any leak
Water pipe line also laid along with the sanitary line so that once more road cutting is avoided
5" hole punctured on the main sanitary line and line connected from our house
Pipe line to provide gravitational flow of all waste water from the house
Joint is firmly concreted to avoid any leak
Water pipe line also laid along with the sanitary line so that once more road cutting is avoided
Comments
Post a Comment