Puja done on 22nd November 2017 for placing the mold of 1st floor ceiling 2nd floor ground
Bar bending work for 1st floor ceiling 2nd floor floor
Void space between 1st floor and 2nd floor
Lifting of concrete from ground to 2nd floor
Get link
Facebook
X
Pinterest
Email
Other Apps
Comments
Popular posts from this blog
Structural Engineer discussing the marking of footings Granite stone for retainer walls on east and west side Footings are getting ready making of footings is in progress Positioning of footings
1 door Allan wardrobe shelves open side view 1 door Allan wardrobe shelves open 1 door Allan wardrobe 2 door Allan wardrobe 2 door Allan wardrobe shelves open side view 2 door Allan wardrobe shelves open
Comments
Post a Comment