All the interconnecting beams which would come below the floor level are ready The basement is now ready for filling soil and concreting of thr floor The basement walls are almost done. next is water proofing. Staircase concrete steps are ready with landing place in between before reaching the floor
Posts
Showing posts from July, 2017
- Get link
- X
- Other Apps
Basement staircase frame can be seen with landing place Basement backside wall would be completed once this shuttering is removed Interconnecting beams between different pillars and sump tanks Three side frames are built in south, west, north on which Windows would be placed on for bringing in light in the basement
- Get link
- X
- Other Apps
Sanitary pipes in our locality is running 15 feet below the road and we had to use JCB to dig to this depth 5" hole punctured on the main sanitary line and line connected from our house Pipe line to provide gravitational flow of all waste water from the house Joint is firmly concreted to avoid any leak Water pipe line also laid along with the sanitary line so that once more road cutting is avoided