Centering and Shuttering for basement retainer wall to fill the concrete mixed with water proofing chemical
Sump Bases are ready
Sump Bases are ready
Basement wall now raised up to 3 feet level
Curing of the basement foundation and side walls
Get link
Facebook
X
Pinterest
Email
Other Apps
Comments
Popular posts from this blog
Roof Floor Pre-mold Puja Roof Floor Pre-mold Puja Electrical and Data circuit for 2nd floor from roof floor Electrical and Data circuit for 2nd floor from roof floor Front elevation of the house as seen from the road
Tools used for doing work of pointing (filling cement and adjusting in unplastered area) Mattakolu stick used for adjusting the level between the bricks Using Mattakolu between bricks to remove extra cement Applying cement for pointing work in unplastered area
1st Floor ceiling, 2nd floor floor shuttering is getting ready for concreting Front entrance to the house as seen from the road Bay window as seen from the front entrance to the house Staircases to different floors and basement as seen from the entrance
Comments
Post a Comment