 Doors before top coat  French window after rain coat to protect against water  wood polishing work in progress
Image
 Fixing of shower enclosure in 2nd floor attached bath. watch the lighting from solatube  second floor common bath shower enclosure  First floor attached bath with shower enclosure ground floor attached bath with shower enclosure 
Image
 Modular Kitchen boxes frame work in which Haffle tandem boxes fit  Modular Kitchen boxes frame assembly work  Modular Kitchen boxes frame assembly work 
Image
 second floor marble floor after polishing first floor marble floor after polishing  first floor marble floor after polishing  Marble polishing is in progress  skirting polishing work  skirting polishing work
Image
 Solatube installation work on terrace  After fixing the dome. Now we have to paste tiles to the side solatube light as seen from the closet 
Image
 After application of putty  Cleaning the wall uniformly Watching the unevenness of the wall with light
Image
 Ajji, Thatha and sneha visited the house during Dasara holidays