Posts

Showing posts from September, 2019
Image
 Basement stairs tile work and wood work Basement stairs wood work railings both sides  Basement stairs wood work railings both sides
Image
 Stairs with railings and skirting  Railings at the terrace entrance  Railings to the basement Puja room door fixed
Image
 Railing alignment  Pillar alignment  Trimming pillars to match  wooden steps as seen from below Fixing steel strip before fixing railings
Image
 Garage area now cleaned up  Garage area steps for keeping flower pots  parking area to hold 3 or 4 cars entrance to parking area
Image
 Wooden steps are anchored to the concrete steps  Anchor bolt is driven down and then tightened with spanner  The three inches projections is where the pillars get bolted to wooden steps Adjusting the levels of each step
Image
 Curveture preparation of each step  Landing place wood sheets preparation  All the pillars are cut to length driving hole in the bottom to fix the pillar with bolt and nut to steps
Image
 The final point of sewerage before connecting the main line  This sewerage inspection chamber is for 1st and second floor rest rooms This sewerage inspection chamber is for ground floor and outside toilet connection
Image
 Drive way for the garage  Garage area with railings in front  Cauvery water tank cover  Rain water tank cover  Saplings planted outside to provide shade Saplings planted outside to provide shade 
Image
 Jagli tail laying  Jagli edge finishing after tail laying Finishing of wall after tail laying
Image
 Ground floor bath with marble top for flush tank  powder room with marble top for flush tank  first floor bath with marble top for flush tank  second  floor common bath with marble top for flush tank second floor attached bath with marble top for flush tank