Wooden steps are anchored to the concrete steps Anchor bolt is driven down and then tightened with spanner The three inches projections is where the pillars get bolted to wooden steps Adjusting the levels of each step
Curveture preparation of each step Landing place wood sheets preparation All the pillars are cut to length driving hole in the bottom to fix the pillar with bolt and nut to steps
The final point of sewerage before connecting the main line This sewerage inspection chamber is for 1st and second floor rest rooms This sewerage inspection chamber is for ground floor and outside toilet connection
Drive way for the garage Garage area with railings in front Cauvery water tank cover Rain water tank cover Saplings planted outside to provide shade Saplings planted outside to provide shade
Ground floor bath with marble top for flush tank powder room with marble top for flush tank first floor bath with marble top for flush tank second floor common bath with marble top for flush tank second floor attached bath with marble top for flush tank