 Concrete bed before construction of wall  Front wall from outside before grout  Front wall from inside Front wall after grouting and finishing
Image
 Concrete bed for fixing the rail for the gate  rail for the gate is being fixed   rail for the gate is being fixed  rail for the gate is being fixed
Image
 South side compound wall   South side compound wall plastering  South side compound wall after finishing
Image
 Backyard on the university campus cleaned up and leveled for tree planting  Pit for saplings 21 in numbers
Image
 Cauvery water connection locating water pipe  Cauvery water connection water pipe connected Cauvery water connection meter location
Image
 Solar water heater of 200 LPD capacity installed on the terrace
Image
 Sewerage lines getting connected from all restrooms to main sewerage below the road  Sewerage pit (later with lid for inspection incase of blockage) Sewerage pit (later with lid for inspection incase of blockage)
Image
 Front door metal frame for safety locking from inside and outside second floor balcony door metal frame for safety locking from inside Terrace floor door metal frame for safety locking from inside
Image
 Bescom connecting the power to the house   Bescom connecting the power to the house  Bescom connecting the power to the house
Image
 Mangalore tile roof fabrication as seen from ground level   Mangalore tile roof fabrication as seen from ground level  Mangalore tile roof fabrication as seen from terrace floor