Ardex gold adhesive for fixing tiles Cleaning the terrace before laying the tiles spreading of paste prepared with ardex polymer modified cementing fixing of tiles on the ardex cement
Water tank connections delivery and Supply lines Gully drop for draining car washed water without letting on the road inlet and outlet for pressure pump core cutting for pipe connections
Core cutting machine used to make a hole in RWH tank readying for core cutting of drinking water tank from terrace pipe is laid for rain water harvesting tank
Arrival of Johnson solar reflective tiles for terrace Johnson solar reflective tiles stacked at the entrance of terrace Arrival of Ardex gold adhesive Adhesive stacked at the ground floor