Posts

Showing posts from October, 2018
Image
 Last bay window between ground and basement  All four bay windows in place as seen from road  Garage and garden separator as seen from road  Garage and garden separator as seen from front door
Image
 University campus wall plastered  Wall for last bay window at ground floor level Garage and walk path separator 
Image
 Bay window dining area thin wall on both side of the seating  Staircase plastering and finishing the sides of the staircases, landing places  Finishing of all places that would be covered by wood
Image
 Safe Zone location of Godrej in the basement below staircase  Basement plastering Basement plastering
Image
 Leveling of terrace floor for water flow to the corner for feeding into rainwater tank  Electrical work at the terrace before laying the floor  New flooring laid on terrace for tile work Smooth surface for the tile work
Image
 Our neighbors visited us for the first time   Our neighbors visited us for the first time Basement plastering from outside completed
Image
 Water proofing of terrace floor  Water proofing of terrace floor  Grill fixed for sky light to staircase bay Grill fixed for sky light to first floor and second floor
Image
 Plastering work on south side  Plastering work on east side Plastering work on east side
Image
 Pointing work of front elevation  Pointing work on east side Pointing work on south side
Image
 Glass fitted to French window  French window with glass fixed as seen from road  Dining area window with glass being fixed  utility are with window glass shutters fixed  East side window with glass shutters
Image
 Glasses fitted window by window both with fixed glass and with shutters  Basement window has fixed glass and shutter with glass  out of 4 bay windows 3 are fitted with glasses also bed room fixed and shuttered Ground floor corner window fitted with fixed glass in the center and shutters on both sides