Last bay window between ground and basement All four bay windows in place as seen from road Garage and garden separator as seen from road Garage and garden separator as seen from front door
Bay window dining area thin wall on both side of the seating Staircase plastering and finishing the sides of the staircases, landing places Finishing of all places that would be covered by wood
Leveling of terrace floor for water flow to the corner for feeding into rainwater tank Electrical work at the terrace before laying the floor New flooring laid on terrace for tile work Smooth surface for the tile work
Water proofing of terrace floor Water proofing of terrace floor Grill fixed for sky light to staircase bay Grill fixed for sky light to first floor and second floor
Glass fitted to French window French window with glass fixed as seen from road Dining area window with glass being fixed utility are with window glass shutters fixed East side window with glass shutters
Glasses fitted window by window both with fixed glass and with shutters Basement window has fixed glass and shutter with glass out of 4 bay windows 3 are fitted with glasses also bed room fixed and shuttered Ground floor corner window fitted with fixed glass in the center and shutters on both sides