 Glass fitted on Bay window   Shutters with Glass fitted on bedroom  window   Shutters with Glass fitted on bedroom  window   Shutters with Glass fitted on bedroom  window  Shutters with Glass fitted on  windows
Image
 Plastering of water tank housing  Plastering and pointing work of front ground level  Plastering and pointing work of front ground level garage side
Image
 Assembly of French windows  French windows as seen from Road French windows as seen from dining
Image
 Front door pointing work lot of efforts  Assembling brick pieces Final look of the front door
Image
 Cinder is light weight material for filling in sunkun places  Like toilets, balcony front and back  Now unpacked and filled in toilet area after filling it needs to be filled with concrete 
Image
 Front elevation dressing  Front elevation dressing Front elevation dressing 
Image
 Plastering of beams in the front elavation Plastering the wall on the water tank side  Plasterring around the window  Pointing of brick wall
Image
 There are 3 pillars outside the house supporting the structure of which 1st in garage area being plastered  This is second pillar of the 3 pillars outside the house supporting the structure  area being plastered This is the 3rd pillar in the corner Deva mule where we plan Tulasi 
Image
 Pointing of bricks in the terrace area after plastering beams and pillars  Plastering of Sajja above the window with slope Plastering of Sajja on apartment side