Posts

Showing posts from August, 2018
Image
 Location of meter panel from garage side  Electrical panel with 4 meter bus bar and place for fitting electrical controls   Electrical panel with 4 meter bus bar and place for fitting electrical controls  Panel fitting into the wall From rear side which now needs to be fitted with iron bars and mesh and plastered
Image
 Terrace walls plastering from inside  Plastering of terrace beams and pillars  Plastering of terrace window contemporary Plastering of water tank
Image
 Pointing work (filling the cement in between the bricks uniformly with tools )  Pointing work in the staircase bay terrace floor from inside Plastering of the staircase from Inside
Image
 Tools used for doing work of pointing (filling cement and adjusting in unplastered area)  Mattakolu stick used for adjusting the level between the bricks  Using Mattakolu between bricks to remove extra cement Applying cement for pointing work in unplastered area
Image
 Car Garage front side plastering other than porotherm from road side   Car Garage front side plastering other than porotherm from main door side Staircase plastering
Image
 Mold for the staircase bay mismatch and brick wall protruding   Mold for the staircase bay mismatch and brick wall protruding close view  Rectification of the Mold for the staircase bay to match with wall 
Image
 Second floor west side bed room box for completed  Second floor west side bed room plastering  Second floor balcony plastering Second floor washing machine area plastering 
Image
Marble for flooring from Gala Marble