 Bay windows between basement and ground floor, ground and FF and FF & SF can be seen.  Bay window as seen from school side. raised pillars to accommodate next floor  Staircase from first floor to landing place Dining and kitchen area of 1st floor. 
Image
 Puja is done before putting each mold  Diesel operated lift mechanism to lift concrete mixed at ground level to first floor   Concrete with 125 bags of cement with 250 bags of sand 4 trucks of jelly was done in just 6 hours  Lift mechanism to lift concrete mixture
Image
 Ground floor ceiling with conduits for cabling of network, electrical, CCTV, DLNA network  These conduits are for services for ground floor requirements, security cameras Home automation circuits are included 
Image
 First floor as seen from North east corner from flat side. People standing is bed room  Mom standing on the landing place between ground and first floor staircase  First floor area towards the agricultural college campus  Kitchen and restroom, powder room area
Image
 beams supporting the roof for the ground floor getting aseembled
Image
 Bay window between GF and FF  Bay window as seen from the road side  Staircase to Bay window  GF roof in the backyard and gap between University wall Garage space
Image
 Very good lighting in the basement corner without window hence no sky light - cost saved  Staircase to first floor with landing space bay window (projecting outside)  Garden space with car parking ground floor roof shuttering in progress. The mold is scheduled for 20th October