Posts

Showing posts from August, 2017
Image
 semi finished wooden materials for doors and windows in room2  semi finished wooden materials for doors and windows room2  semi finished wooden materials for doors and windows room3 semi finished wooden materials for doors and windows rrom3
Image
 Front door unpolished  Pooja room door unpolished  semi finished wooden parts for landing place, ward robes semi finished wooden parts for staircase steps, pillars for railings, some furnictures
Image
 Inspecting the construction activity  Sump tank openings  Sump tank openings
Image
 Sump tank mold (top cover) getting ready for concreting-bar bending job  Sump tank opening 2 feet x 2 feet
Image
 Water sump being laid with tiles
Image
 3D View Option 06 Received today 10.08.2017   3D View Option 05 Received today 10.08.2017 3D View Option 04 Received earlier   3D View Option 03 Received earlier  3D View Option 02 Received earlier 3D View Option 01 Received earlier
Image
 Mixing of water proofing compound which is bonding material one in liquid form and other in powder form  Applying 3 coats of mixture outside of retainer wall which forms a thick layer Water proofing of sump both inside and outside including inside flooring
Image
 Soil filling in the basement treated with anti-termite chemical terminator before flooring  Flooring of the basement completed with staircase in place Place below the staircase is used as temporary sump 
Image
 Basement staircase getting ready  Curing of concrete structure with water Sump tanks filled with water for curing